817-576-2617

  • Home
  • Concrete Services
  • Who We Are
  • Get a Quote
  • Blog
  • FAQs
  • More
    • Home
    • Concrete Services
    • Who We Are
    • Get a Quote
    • Blog
    • FAQs

817-576-2617

  • Home
  • Concrete Services
  • Who We Are
  • Get a Quote
  • Blog
  • FAQs
Parking Lot Pros

concrete pavement services faq's

Concrete

Concrete

Concrete

  • Concrete is made of Portland cement, sand, rock, water, and sometimes other chemicals to help speed or slow the curing process.
  • "Curing" is one of the most important steps in placing concrete, as it gains strength and hardens over time.  
  • PSI is used in describing the strength of the concrete.  Different strengths are used for sidewalks compared to truck lots, building slabs, etc.  

asphalt

Concrete

Concrete

  • Asphalt is used on more than 90% of parking lots around the world.  
  • 80% of old asphalt pavement is removed and recycled each year.
  • Asphalt pavement should be seal coated every three years or as needed to prevent deterioration.

Striping

Seal Coat

Seal Coat

  • Striping paint typically dries in as little as 30 minutes for traffic use.
  • Parking lots require compliance with the Americans with Disabilities Act (ADA) Standards.
  • Re-striping a parking lot should be done every two years for aesthetic and safety reasons.  

Seal Coat

Seal Coat

Seal Coat

  • Seal coating is a safeguard that prolongs the life of parking lots by protecting it from things such as sunlight, rain, and ice.  
  • Seal coating protects the parking lot from damage by preventing asphaltic binders from drying out, cracking and becoming brittle.
  • If the parking lot is in great shape seal coating can last up to three years. 

Copyright © 2023 Parking Lot Pros - All Rights Reserved.


Powered by GoDaddy

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept